Product Name
EPDM Self Adhesive Pad
Material
EPDM, Rubber, Silicone
Hardness
Soft (15-75 Shore A)
Adhesive Type
Water Activated, Hotmelt Glue
Processing
Cutting, Extrusion, Coating, Gluing
Application
Industrial Sealing, Anti-Shock
Silicone Hemisphere Bumper, Non-Skid Isolation Rubber Feet with Adhesive Vibration Absorption Pads
Vibration Absorption Pads are crafted with platinum-cured silicone, offering quick installation and discrete support. These unique spacers apply easily to your equipment with sticky adhesive backing to absorb vibration, impact, and "noise" to let true sound shine through.
★ Key Features
✔ Insulation & Temperature resistance
✔ Anti-slip & Excellent vibration mitigation
✔ Excellent seal, waterproof and anti-oil
✔ Durable: resistance to corrosion and friction
✔ Flexible: suitable for irregular surfaces
★ Applications
1. Pluck away paper and stick to bottom of machines
2. Avoid machine wear and provide buffer action
3. Cushioning for desks, shelves, work areas, and floors
4. Prevent skidding, reduce noise, and prevent scratches
Frequently Asked Questions
What materials are these self-adhesive pads made of?
The pads are primarily made from high-quality EPDM, eco-friendly silicone rubber, or standard rubber depending on your specific requirements.
What is the temperature resistance range?
Our standard EPDM pads withstand -50~130℃, while our silicone variants can handle extreme temperatures ranging from -40 up to 240ºC.
Can I customize the size and color?
Yes, we provide full OEM and customized services. You can specify the size, shape, and color that best fits your industrial or home application.
Do the pads leave any residue after removal?
No, our self-adhesive pads are designed for strong adhesion during use but are engineered to leave no residue upon removal.
Are these pads waterproof and anti-slip?
Absolutely. They feature excellent sealing properties making them waterproof and anti-oil, while the rubber material provides superior anti-slip and vibration absorption.
What is the typical lead time for orders?
Sample production takes about 7 days, and mass production delivery typically occurs 10-15 days after payment.